A2 ICT so far..
okay so far i have done my e-portfolio structure which i created on Adobe Dreamweaver CS4 this took me about a week.When i tranfered it onto my new laptop i found that the links didn't work because i forgot to move the CSS template along with it.So i downloaded the template again and then re-created it and made sure all the links worked.I created one e-portfolio for each unit.The main pages and title pages consist of green or purple writing on a black background. Then i went on to my project proposal, which i finished the weekend before i had to hand it in, so i had enough time to read it through and add things if i needed. I am now doing the functional specification which i'm almost done.